Hello,
Can I go back to a previous version of ProjeQtor ?
The issue is : I used v6.3 and created a bunch of projects, when I try to enter their plannings, I don't want to have an automatic real calculation of their duration.
In the previous versions (5.5.4) the planning duration calculation was not automatic. I could have a complete control of its running time.
With v6.3 and above it's no more possible, or maybe I missed something and have make some parameters changes, but don't want to do it.
I want to Go back to 5.5.4, to have -control again on the planning real duration calculation, and I don't know how to manage using the same database from 6.3 back to v5.5.4.
Please assistance.
Can I go back to a previous version of ProjeQtor ?
The issue is : I used v6.3 and created a bunch of projects, when I try to enter their plannings, I don't want to have an automatic real calculation of their duration.
In the previous versions (5.5.4) the planning duration calculation was not automatic. I could have a complete control of its running time.
With v6.3 and above it's no more possible, or maybe I missed something and have make some parameters changes, but don't want to do it.
I want to Go back to 5.5.4, to have -control again on the planning real duration calculation, and I don't know how to manage using the same database from 6.3 back to v5.5.4.
Please assistance.